II Edge cutting machine configuration: (Consultation phone: 18127972229)
1. All hydraulic components of the equipment are made of Taiwanese and Japanese brands, with fast response speed and long service life.
2. The trimming machine can discharge materials from all four sides, move them backwards, and discharge materials in the middle. The leakage hole can be opened according to the product; There are multiple sets of blowing functions on both sides of the machine. A copper tube is installed on the left side of the punch press to blow air. The air source enters the 1/2 iron tube through the blowing solenoid valve, with three pipes on one side
3. The electrical box is located on the upper right side of the manual operation side and is equipped with thermal overload and leakage protection. External cables are protected by cable trays, junction boxes, or pipelines. The layout of electrical components inside the electrical box is reasonable and beautiful; Any operation in counting, manual, semi-automatic and other modes. Easy and convenient operation, with clear and concise instructions.
4. The fuel tank is located above the oil cylinder plate and is designed with full sealing around it; Equipped with an oil cooling mechanism
5. The equipment oil circuit adopts advanced mother and child oil cylinder oil circuit, with fast and slow downward pressure. During air compression, the small cylinder rapidly downward pressure, and when quickly closing the mold and approaching the product, it is converted into a large cylinder pressure action for punching and cutting the product. The punching speed is fast, the energy-saving noise is low, and the damage to the product mold is minimal. Efficient and stable operation, as well as convenient maintenance.
6. The equipment oil circuit is equipped with an anti drop cylinder hydraulic safety lock, and the oil pipe uses imported high-quality high-pressure oil pipe. Safe and reliable, easy to maintain.
7. The equipment has a large opening and closing stroke, which can be adjusted using proximity switches, and the fast and slow positions can also be adjusted. The thickness of the trimming die is widely applicable, and the cutting height range of the product is also wide.
8. Install a set of safety gratings, with a pair of operating surfaces and no less than 6 points. The front is a robot or manual feeding position, and the grating used here is waterproof and oil proof. On the left, right, and back are movable doors that can be opened on both sides Anti mistake and error prevention, multiple protections, high safety performance, user-friendly operation design, simple and easy to understand, convenient for maintenance and upkeep.
9. The equipment circuit control uses Mitsubishi PLC control, and is equipped with relevant IO tables and user manuals. The program has an interlock function. There are 4 reserved input and 4 output PLC points for the convenience of adding robots and other related automation devices in the future. Relay control, fast response speed to prevent common relay contact adhesion problems.
10. Pneumatic components are sourced from well-known brands such as Yadeke, while electrical components are sourced from well-known brands such as Schneider Omron Chint. Long service life and easy procurement of accessories.
11. The punch press has three states (semi-automatic, manual, and fully automatic). Fully automatic is mainly connected to the robot, and manual operation of the punch press button is ineffective, requiring a separate start point; The semi-automatic manual operation is effective in starting the punch press; Manual mode is mainly used for mold installation and adjustment. The manual mode must be started by both hands within 0.5 seconds before the machine can move.
The speed, pressure, time, counting, etc. of the equipment can be adjusted according to actual needs. There is also a pressure holding function.
13. The equipment can be equipped with lighting fixtures or come with pressure plate screws and shock-absorbing pads. (Each unit is equipped with a complete set of 4 M14 lock mold T-bars).
14. The overall structure is four columns and three plates, with the main board made of A3 steel plate material and factory level adjusted to within 0.15mm.
15. The guide column is made of hardened chrome plated steel rod, made of Cr15 material.
III Equipment installation, debugging, quality assurance, and acceptance instructions
Installation can only be carried out when the demand for water, electricity, gas, etc. is ready.
Electricity: 380V cable 4 * 4 square or 3 * 4 1 square.
Gas: 6KG pressure, ¢ 12MM straight gas connector.
Hydraulic oil selection: It is recommended to use HM46 # anti-wear hydraulic oil
For warm regions in the south (such as Southeast Asia and other tropical areas), please use HM68 #
For colder regions in the north (such as the three northeastern provinces and other high latitude areas), please use HM32 #
If necessary, the supplier shall dispatch personnel to the buyer's site for installation and commissioning, and participate in the trial operation and acceptance of the equipment. During this period, training on equipment use and safety maintenance shall be organized.
3. The hydraulic system comes with a one-year warranty, and the entire machine comes with a one-year warranty. Vulnerable parts are not covered by warranty.
4. Within 7 days after the supplier installs and debugs the equipment, the purchaser shall conduct equipment acceptance confirmation. If any non-compliance is found during this process, the supplier shall be notified in writing or electronically (via email, WeChat, etc.) for rectification. If the purchaser fails to notify the supplier of the above-mentioned content within 7 days after the delivery of the equipment or completion of rectification, it shall be deemed that the equipment has met the requirements of the contract and technical agreement.
Contact: Manager Zhang
cell phone:18127972229
Mail:hivekt@163.com
hivektec@gmail.com
address:Donghua Industrial Area, Xintang Town, Zengcheng Distric, Guangzhou, Guangdong, China
Manufacturer Customer Service